EDISMA BEMS
Service contents
EDISMA Energy Management System is a system that monitors and controls power consumption (demand).
- Automatically control air conditioning, etc. with demand control during power peaks to cut peaks
- Visualize power usage on PCs and smartphones
- Providing consulting services for optimizing power usage from power data
We support continuous power cost reduction through energy management support services.

* 1 This service allows you to use the functions provided by our EDISMA server in an Internet environment.
Visualization screen
You can check the total power consumption and power measurement data for each breaker by switching to year, month, week, and day units.

By comparing and analyzing various data, wasteful power consumption can be found and used for operational improvement.
System configuration example
The main unit and EDISMA server exchange data and signals via the Internet.
Measures and monitors power consumption through measurement and control devices and multipoint measuring instruments connected to the main unit via LAN, and when the power demand value approaches the target value, performs demand control by automatically controlling preset outputs such as air conditioning. You.

System lineup
EDISMA BEMS Lite
Overview | Target building | Contract power (kW) | Approximate cost (Including construction cost and tax) | Service cost (Monthly / tax included) |
---|---|---|---|---|
For small buildings, the visualization and automatic control are possible with an inexpensive system with a small equipment configuration. | Small stores, offices, etc. | 50~100 | 500 to 1.5 million yen | 5,500 yen ~ |
EDISMA BEMS Standard
Overview | Target building | Contract power (kW) | Approximate cost (Including construction cost and tax) | Service cost (Monthly / tax included) |
---|---|---|---|---|
Suitable for medium-sized and larger buildings, visualization and automatic control are possible according to customer needs by combining with multi-point measurement and control slave units. | Stores, offices, factories, etc. | 100~500 | 800-2,000,000 yen | 11,000 yen ~ |
Case study
Home center
Before introduction After introduction Contract power 293kW 255kW Electricity consumption / year 863,800kWh 842,600kWh Electricity fee / year 15,400,000 yen 14,400,000 yen 削減金額/年 1,000,000 yen
Reduction rate 6.5%
pet Shop
Before introduction After introduction Contract power 107kW 92kW Electricity consumption / year 327,241kWh 282,039kWh Electricity fee / year 8,175,000 yen 6,980,000 yen 削減金額/年 1,195,000 yen
Reduction rate 14.6%
Nursing home for the elderly
Before introduction After introduction Contract power 92kW 80kW Electricity consumption / year 377,491kWh 355,172kWh Electricity fee / year 6,930,000 yen 6,130,000 yen 削減金額/年 800,000 yen
Reduction rate 11.5%
Special elderly nursing home
Before introduction After introduction Contract power 128kW 122kW Electricity consumption / year 531,684kWh 514,946kWh Electricity fee / year 9,740,000 yen 9,400,000 yen 削減金額/年 340,000 yen
3.5% reduction rate
Restaurant chain
Before introduction After introduction Contract power 87kW 77kW Electricity consumption / year 290,340kWh 266,994kWh Electricity fee / year 5,613,000 yen 5,180,000 yen 削減金額/年 433,000 yen
Reduction rate 7.7%
Agricultural and livestock exchange
Before introduction After introduction Contract power 139kW 116kW Electricity consumption / year 340,557kWh 313,614kWh Electricity fee / year 8,863,000 yen 7,937,000 yen 削減金額/年 926,000 yen
Reduction rate 10.4%
Consumer electronics store
Before introduction After introduction Contract power 98kW 85kW Electricity consumption / year 208,884kWh 191,057kWh Electricity fee / year 5,884,000 yen 5,275,000 yen 削減金額/年 609,000 yen
Reduction rate 10.4%
Packaging bag manufacturing plant
Before introduction After introduction Contract power 367kW 348kW Electricity consumption / year 527,214kWh 507,334kWh Electricity fee / year 13,990,000 yen 13,090,000 yen 削減金額/年 900,000 yen
Reduction rate 6.4%
Contact information
■ Management consignment: EDION Cross Ventures Co., Ltd. Energy Environment Promotion Section
電話番号:06-6202-6064
Reception time: 9: 30-18: 30 (excluding Saturdays, Sundays, holidays, and New Year's holidays)